Cable Parts

UL Standard EMT Pipes Electrical Steel Tubes

ZHEJIANG TENGZE ELECTRICAL EQUIPMENT CO., LTD.
  • Color:Zinc Colour
  • IP Rating:IP68
  • Surface Treatment:Galvanised
  • Application:Wall
  • Material:Carbon Steel
  • Certification:UL

Base Info

  • Finish:Pre-Galvanized
  • Outside Diameterr:17.93-114.3mm
  • Wall Thickness:1.07-2.11mm
  • Length:3050mm
  • Transport Package:Standard Seaworthy Packing
  • Specification:1,2",3,4",1",1-1,4",1-1,2",2",2-1,2",3",3-1,2",4"
  • Trademark:TUNZEL
  • Origin:Zhejiang, China
  • HS Code:7306309000
  • Production Capacity:50000,Month

Description

Length  inchinchmmInchmm(1)mm(2)mmfeetmm1/2" 0.706 17.93  0.622 15.80 1.07 0.85 10 3050 3/4" 0.92223.42 0.824 20.93 1.25 0.95 103050 1"1.16329.54  1.049 26.64 1.45 1.10 10 3050  1-1/4"1.51038.35 1.380 35.05 1.65 1.30 10 3050  1-1/2"1.740 44.20 1.610  40.89  1.65 1.30 10 3050  2" 2.197 55.80 2.067  52.50  1.65  1.40  10 3050  2-1/2" 2.875 73.03  2.731  69.37 1.83 - 103050 3"  3.500  88.90 3.356 85.24 1.83 - 103050 3-1/2" 4.000101.60  3.834 97.38 2.11 - 10 3050  4"  4.500 114.30 4.334 110.08 2.11 - 10 3050 Production Process
 UL Standard EMT Pipes Electrical Steel TubesUL Standard EMT Pipes Electrical Steel TubesUL Standard EMT Pipes Electrical Steel TubesUL Standard EMT Pipes Electrical Steel Tubes
 FAQ

 Q1:When can I get the quotation?
 A1:Within 24 hours.

 Q2:Which port do you refer?
 A2:Shanghai port or Ningbo port.

 Q3:What's your Minimum Order Quantity(MOQ)of your product?
 A3:Generally,MOQ is 1x20' container.Others can contact us directly.

 Q4:How about the lead time?
 A4:Usually 20 days after deposit in our account.If you have any questions,please feel free to contact us!!